Journal
Notes written in the field, cleaned up afterwards. Distances in kilometres, elevations in metres, times as moving time rather than elapsed.
Survey 04: what changed on the northern passes
Three seasons of notes, compared against the 2023 track set. The headline is concrete: roughly 40 km of the old gravel alignment is now poured, and the switchbacks above Dong Van are being bypassed by a new cut that is not on any map we can find.
What this means for planning: the loop is faster than the published figures suggest, but the shade is worse. The old alignment had trees; the new cut does not.
If you are walking it in May, start before five. The plateau bakes by ten and there is nothing to sit under for eleven kilometres.
Water points were re-checked on the way through. Two of the four springs marked on the printed sheets were dry; the one behind the school at Sung La was flowing and cold and is now the anchor of that stage.
Water, and the myth of the marked spring
Half the springs on the printed maps do not exist in April. This is not a conspiracy: they exist in October, and the sheets were drawn then.
Our rule now is simple — a water point goes into the route file only if we have seen it flowing after three consecutive dry weeks. Everything else is marked “seasonal” and treated as absent.
On the Truong Son corridor this changed the plan materially: two stages that looked comfortable became 30 km carries. The alternative — trusting the map — is how people end up knocking on doors at dusk.
Ferry timetables are fiction
Every printed timetable we carried was wrong within a week. The crossings we list in the delta link are the ones we actually used, with the time of day we used them, and a note on how full the boat was.
Practical advice: arrive early, ask the ticket seller rather than the sign, and assume the last crossing of the day leaves earlier than advertised.